Info

Construction of Songshan Line of Taipei MRT.

The base of the tunnel is lined with rebar and awaits the pouring on concrete for the track bed.

Add to Cart Add to Lightbox Download
Filename
CF-120612mrt5453.jpg
Copyright
©2012 Craig Ferguson
Image Size
5476x3650 / 14.2MB
Contained in galleries
Taipei MRT
The base of the tunnel is lined with rebar and awaits the pouring on concrete for the track bed.